Full fibre installation day: what happens, how to prepare, and what to do if it goes wrong
An Openreach engineer runs fibre from a pole or underground duct to a small box on your outside wall, drills a small hole, and fits an Openreach box (the ONT) inside, near a double power socket, then connects and tests your router. Openreach says most installs take between one and four hours. Someone over 18 who can decide where things go should be in for the whole appointment.
Last updated: · Written by The NetSorted team
On this page (8 sections)
Full fibre is the biggest change to most homes’ broadband in decades, and for many people it is the first time an engineer has needed to visit since the phone line went in. Ofcom says full fibre was available to 82% of UK homes in January 2026, and the old phone network is being switched off, so a lot of installation days are coming.
This page walks through the day the way Openreach and the main providers describe it, from the weeks before to what to do if it goes wrong. It is mostly about the Openreach network, which BT, EE, Plusnet, Sky, TalkTalk and Vodafone sell over, with notes on CityFibre where it differs. Every claim is from the company’s own pages, read on 7 November 2026.
How the fibre gets into your home
The route is the same in most homes. Openreach describes it in four parts.
- From the network to your wall. Openreach says the engineer brings the fibre from a nearby pole or underground to a small junction box fitted on your external wall, which it describes as a 15cm by 13cm unit.
- Through the wall. The cable comes in, usually through a small hole drilled in the wall. Openreach says you agree with the engineer where the hole goes.
- The Openreach box. Inside, the engineer fits the optical network terminal, or ONT: the white Openreach box that your router plugs into. It needs a power supply. Openreach says that if the power plug is unplugged, your broadband stops working.
- Your router. Openreach says the engineer will connect your main device to the new router, check everything is working and make sure you are happy.
Openreach says the ONT belongs to Openreach, not your provider and not you, and that in almost all cases it should stay exactly where it is. So the most important decision on the day is where it goes.
Before the day
The date, and the messages
Your provider books the installation, not Openreach. Openreach says your broadband provider will confirm an installation date and tell you what to expect, and that you will get reminders before the appointment. To change the date, Openreach says to follow the instructions in those messages or contact your provider. Openreach adds that it does not have access to your order details, so ringing Openreach directly will not help.
Surveys and work before the visit
- A survey, sometimes. Openreach says a survey may be carried out first if your property has unusual access requirements. A pre-visit checks that everything is ready, which might include inspecting underground cables or making sure a pole can take a new fibre line. Openreach says you won’t usually need to be there for a pre-visit.
- Outside work, sometimes. Openreach says it may do some work outside your property before the installation date, and will let you know if so. BT says an engineer may attach the outside box before your appointment.
- A video survey by text. Openreach says you may get a text from its partner VYN inviting you to complete a short pre-visit video survey, and that if you have an appointment booked with Openreach, that message is genuine.
Permissions
- Renting: Openreach’s checklist asks you to have your landlord’s permission for any drilling inside or outside. CityFibre asks you to check that your landlord is happy for the installation to take place.
- Flats and private land: Openreach says wayleave agreements, written legal agreements with the land or property owner, give it permission to install equipment on privately owned land or some buildings, such as apartment blocks. If you rent, it asks for your help liaising with your landlord. Vodafone says you may need to sign one to confirm you have permission, for example with a shared driveway or a rented or listed building.
Alarms, pendants and the phone line
If an intruder alarm, health pendant or wrist alarm uses your phone line, contact your provider before the installation day. Openreach’s checklist says: if you use your phone line to operate an intruder alarm, health pendant or wrist alarm, contact your service provider before your installation. BT adds that if you have an alarm on your phone line, you should let your provider know there might be a false alarm while the work happens. Our guide to telecare alarms and the digital switchover covers care alarms in more detail.
The checklist
| What | Why | Who says so |
|---|---|---|
| Two free power sockets, side by side | The ONT and the router both need one; Openreach says both should be close together near a double socket. TalkTalk says three or four sockets with Digital Voice | Openreach, BT, CityFibre, TalkTalk |
| A spot suited to Wi-Fi coverage | Openreach says somewhere suited to Wi-Fi coverage, not a dark cupboard under the stairs | Openreach |
| The router, unpacked | BT says it needs your Smart Hub to complete the installation | BT |
| Landlord’s permission, if you rent | For any drilling inside or outside | Openreach, CityFibre |
| A word with your provider about alarms | Before the installation, if an alarm or pendant uses your phone line | Openreach |
| A decision maker over 18, all appointment | To give access and agree where equipment goes | Openreach |
| A charged mobile | BT says to keep a fully charged mobile as a backup, because Digital Voice calls, including 999, will not work in a power cut or if your broadband stops | BT |
On the day
Who needs to be in
Openreach says someone over 18 must be present to give access and agree where equipment will be installed, and its checklist asks for a decision maker over the age of 18 throughout the whole appointment. BT puts it as someone over 18 who is able to make decisions about the installation, including what goes where, and suggests staying in for the whole slot and for three to four hours afterwards, in case the engineer arrives towards the end of it.
The engineer will ring ahead. Openreach says they will call or text beforehand to check you are in and ask if there is anything they need to know, such as access or parking.
Check it is really Openreach
Before you let anyone in, Openreach suggests checking their ID badge, because some of its new engineers drive plain white vans. For texts and calls, Openreach publishes the numbers it uses:
| What the message is about | Number Openreach lists |
|---|---|
| We’re installing your new service | 07701 407770 |
| We’re activating your Full Fibre service | 07491 163160 |
| Support for your service | 07701 407771 |
| Appointment updates | 07860 041025 or 07491 163160 |
Openreach says its emails come from [email protected], and that it will never ask for bank details or computer access over the phone or email. Anyone who does is a scammer. BT says you can forward suspicious texts to 7726, and Openreach says that if you are unsure, you should call your provider to check the appointment. Our guide is this call really from BT? covers the phone scams around the switch-off.
How long it takes
Nobody gives one number, and Openreach’s own pages give two:
| Source | What it says |
|---|---|
| Openreach, installation page | Most installations take between one and four hours |
| Openreach, installation checklist | Usually takes around four hours |
| BT | The appointment may last up to four hours |
| Vodafone | Can take up to four hours |
| EE | Usually takes up to three hours |
| CityFibre | Usually two to three hours |
| Plusnet | Usually a couple of hours |
| TalkTalk | The average install takes approximately an hour |
Openreach says it depends on the property and how the fibre is routed, and that extra work such as clearing blocked ducts can make it take longer. Plan for a long morning or afternoon.
What the engineer does, and asks you
- Agrees the route. Openreach says the fibre comes from the nearest connection point, which could be an underground duct or an overhead pole.
- Asks permission before digging or drilling. Openreach says the engineer will ask you to sign a permission form first, and may drill a couple of holes outside for ladder safety, which it repairs. Vodafone says that in some cases it needs to dig a route through a garden or driveway, and that it will always talk to you first.
- Agrees where the hole and the box go. This is your decision as much as theirs. Pick the spot where you want the router, because the ONT sits beside it and should not move.
- Connects and tests. Openreach says the engineer will test your new line and connect your main device to the router. BT says its engineers run a speed test and show you how to connect two more devices.
- Tidies the old wiring. BT says it will upgrade the primary phone socket, and that the work may include running new cables or disconnecting old extension wiring and powerline adapters. If you use powerline adapters, expect to set them up again.
Your landline after full fibre
Full fibre changes how a home phone works. Openreach says digital phone lines let you make and receive calls over a digital connection, usually through your broadband router rather than a wall socket, and that they need power to work. BT’s Digital Voice page describes moving your phone from its old socket to the Smart Hub 2. BT also says not to switch off an Openreach fibre modem at the mains after a broadband and voice service is installed, or you might not be able to make and receive calls.
What a power cut means for that phone, and what to keep as a backup, is in our guide will my digital landline work in a power cut?. Some packages have no phone at all: Plusnet says its full fibre is broadband only, and that losing your landline means medical services or alarms connected to the phone will also stop working.
If it goes wrong
The engineer cannot finish
Openreach says some installations are more complex and need a follow-up appointment. Its page on delays lists the usual reasons:
- Underground work: digging or clearing existing ducts, sometimes by hand on soft ground, sometimes by specialist teams on hard surfaces.
- Water or debris: clearing a box, manhole or duct with gully sucking or jetting.
- Permissions: working on private land or public spaces, which Openreach says can take time if councils or property owners have to approve it.
- Others it lists: tree cutting, scaffolding, road closures, or a specialist engineer.
Openreach gives no timescales for any of these. On its page about delays, it says it will keep you updated with any order progress as soon as it can, and to contact your provider directly.
The engineer does not turn up
Openreach says it will usually be in touch on your provider’s behalf to rebook, and that it won’t charge you if Openreach is at fault. Reasons it lists include severe weather, an earlier job overrunning and access problems.
You miss the appointment
Openreach says you will usually hear from it by text or email to reschedule, and that whether a fee applies depends on your provider’s policy.
Compensation
Ofcom’s automatic compensation scheme covers two things that can go wrong with a new service, paid as a bill credit by providers in the scheme without you having to claim:
| What happened | What you get |
|---|---|
| An engineer does not turn up for a scheduled appointment, or it is cancelled with less than 24 hours’ notice | £32.31 per missed appointment |
| Your provider promised to start a new service on a date and did not | £6.46 for each calendar day of delay |
Ofcom says these amounts rise each year with inflation; these are the rates from 1 April 2026. The providers Ofcom lists as signed up are BT, EE, Hyperoptic, Plusnet, Sky (including NOW Broadband), TalkTalk (with restrictions for customers not on the Openreach network), Utility Warehouse, Virgin Media, Vodafone and Zen Internet. Ofcom’s list names retail providers, so on CityFibre it is your provider’s membership that matters. Our compensation calculator works out what you are owed, and who pays for an engineer visit covers charges when an engineer does come.
If you are on CityFibre
CityFibre builds its own network and sells it through broadband providers. Its installation page gives the appointment slots that Openreach’s pages do not: 8am to 1pm or 1pm to 6pm, as arrival times. CityFibre says the engineer may arrive near the end of the slot and the installation takes two to three hours from arrival. It also says your current service keeps working until you choose to cancel it, and that you change or cancel the appointment through your provider.
What we could not confirm
- Openreach’s appointment slot times. None of the Openreach pages we read states them; the times above are CityFibre’s.
- What happens to the old copper line. No Openreach installation page says. BT says it upgrades the primary socket.
- Whether the ONT has battery back-up. Not on Openreach’s pages.
- How long delays take. Openreach lists the causes without timescales.
- Sky and Virgin Media installation pages. We found no Sky help page on full fibre installation day, and Virgin Media’s installation page covers its own QuickStart and technician installs, not full fibre.
Related
- Openreach modem lights: what the lights on the ONT mean once it is fitted.
- Landline switch-off 2027: why so many homes are moving now.
- One Touch Switch: changing provider without a gap in service.
- Moving home: broadband checklist: if the installation is at a new address.
Frequently asked questions
How long does a full fibre installation take?
It varies by property and by who you ask. Openreach’s installation page says most installations take between one and four hours, depending on the property type and how the fibre is routed, and its checklist says an installation usually takes around four hours. BT and Vodafone say up to four hours, EE says usually up to three, and CityFibre usually two to three. Extra work such as clearing a blocked duct can make it longer.
Do I need to be at home for a full fibre installation?
Yes. Openreach says someone over 18 must be present to give access and agree where equipment will be installed, and its checklist asks for a decision maker over the age of 18 throughout the whole appointment. BT suggests someone stays in for the whole slot and for three to four hours afterwards, in case the engineer arrives near the end of it.
Where will the Openreach box go?
You agree it with the engineer. Openreach says it and your router should be close together and near a double power socket, in a spot suited to Wi-Fi coverage, and it would not suggest a dark cupboard under the stairs. Openreach says the box belongs to Openreach and, in almost all cases, should stay exactly where it is, so choose the spot carefully.
Will the engineer drill holes in my house?
Usually one small hole to bring the cable inside, which Openreach says you agree with the engineer. Openreach also says it might drill a couple of holes outside for ladder safety, and that it repairs them afterwards. If drilling or digging is needed, Openreach says the engineer will ask you to sign a permission form first, and if you rent, it asks you to have your landlord’s permission.
What happens to my landline phone?
It depends on your provider and package. Openreach says digital phone lines usually work through your broadband router rather than a wall socket, and that they need power to work. BT’s Digital Voice page describes plugging your phone into the Smart Hub 2. If you use an intruder alarm, health pendant or wrist alarm on your phone line, Openreach says to contact your provider before the installation.
What if the engineer does not turn up?
Openreach says it will usually be in touch on your provider’s behalf to rebook, and that it will not charge you if Openreach is at fault. Under Ofcom’s automatic compensation scheme, a provider in the scheme pays £32.31 if an engineer does not turn up or the appointment is cancelled with less than 24 hours’ notice, and £6.46 a day if a new service does not start on the date promised.
How do I know a text or call is really from Openreach?
Openreach publishes the numbers it texts from and says its emails come from [email protected]. It says it will never ask for bank details or computer access over the phone or email, and that anyone who does is a scammer. BT says you can compare a texting number with Openreach’s list and forward suspicious texts to 7726. If you are unsure, Openreach says to call your provider to check the appointment.
Sources
- Openreach — How is Full Fibre installed? (no page date shown) — checked 7 November 2026
- Openreach — What to expect during your Full Fibre installation (no page date shown) — checked 7 November 2026
- Openreach — Engineer appointments: got an engineer coming? (genuine numbers; no page date shown) — checked 7 November 2026
- Openreach — Engineer pre-visit (no page date shown) — checked 7 November 2026
- Openreach — Openreach equipment in your home (no page date shown) — checked 7 November 2026
- Openreach — Obtaining access and wayleaves (no page date shown) — checked 7 November 2026
- Openreach — Most common reasons for a delay to a Full Fibre installation (no page date shown) — checked 7 November 2026
- Openreach — Why is my Full Fibre installation taking longer than expected? (no page date shown) — checked 7 November 2026
- Openreach — Engineer did not show up? What to do (no page date shown) — checked 7 November 2026
- Openreach — Missed your Openreach appointment? (no page date shown) — checked 7 November 2026
- Openreach — What are digital phone lines? (no page date shown) — checked 7 November 2026
- Openreach — Report a crime or a scam (no page date shown) — checked 7 November 2026
- BT — We’re getting you ready for Fibre (no page date shown) — checked 7 November 2026
- BT — How is Full Fibre installed? (no page date shown) — checked 7 November 2026
- BT — Got a text from BT? (no page date shown) — checked 7 November 2026
- BT — What is Digital Voice? (no page date shown) — checked 7 November 2026
- EE — How is EE Full Fibre Broadband installed? (no page date shown) — checked 7 November 2026
- Plusnet — Full Fibre FAQs (updated 4 November 2026) — checked 7 November 2026
- Vodafone — How Vodafone Broadband is installed (no page date shown) — checked 7 November 2026
- TalkTalk — How Full Fibre is installed (modified 14 November 2025, per page metadata) — checked 7 November 2026
- CityFibre — Installation (no page date shown) — checked 7 November 2026
- Ofcom — Automatic compensation: what you need to know (no page date shown on 2026-11-07) — checked 7 November 2026
- Ofcom — Quicker complaints resolution and more money in your pocket when things go wrong (8 April 2026; rates from 1 April 2026) — checked 7 November 2026
- Ofcom — Connected Nations update: Spring 2026 (published 13 May 2026; data as of January 2026) — checked 7 November 2026
Published and last updated 7 November 2026.